Post-Tensioned Slab Designs

Fits each lot's post-tensioned slab to its plan, options and soils, with PTI checks and tendons laid out for your PE to seal.

Current

By Hand

This lot
0m
Done
0

A builder's plan, the lot's options, its soils report and the firm's beam rules. A post-tensioned foundation plan fills in: the slab outline with the garage and handing, beams under the bearing walls, the lot's soil values, center lift, edge lift and deflection checks, tendons in both directions, and the beam and stressing schedules.

Open the plan and lot soils

Step 1 of 8

  • Options and handing(not yet applied)
  • Your beam spacing rules(not yet applied)
  • This lot's soil values(not yet applied)
  • PTI DC10.5 checks(not yet applied)
Future

With Automation

This lot
0m
Done
0

A builder's plan, the lot's options, its soils report and the firm's beam rules. A post-tensioned foundation plan fills in: the slab outline with the garage and handing, beams under the bearing walls, the lot's soil values, center lift, edge lift and deflection checks, tendons in both directions, and the beam and stressing schedules.

Open the plan and lot soils

Step 1 of 9

  • Options and handing(not yet applied)
  • Your beam spacing rules(not yet applied)
  • This lot's soil values(not yet applied)
  • PTI DC10.5 checks(not yet applied)

3 Designers Per Month

Current224lots
Future672lots
Hours automated
336
per month
Extra lots
+448
per month
Capacity
3x
vs today
Extra fees
$157K
per month