Mining Technical Reports

Turns drill data, QA/QC results and the block model into a draft NI 43-101 technical report your QPs review and sign.

Current

By Hand

This report
0h
Done
0

A project file with the drill database, assays and QA/QC, the block model and last year's report. An NI 43-101 technical report fills in: the 27 items of the form, a drill section with significant intercepts, QA/QC standards against their limits, the mineral resource table, a cross-check against the Summary and news release, and recommendations with a budget.

Open the drill data and last report

Step 1 of 8

  • 0.5 g/t intercept cut-off(not yet applied)
  • Standards within limits(not yet applied)
  • Inferred kept separate(not yet applied)
  • Matches the news release(not yet applied)
Future

With Automation

This report
0h
Done
0

A project file with the drill database, assays and QA/QC, the block model and last year's report. An NI 43-101 technical report fills in: the 27 items of the form, a drill section with significant intercepts, QA/QC standards against their limits, the mineral resource table, a cross-check against the Summary and news release, and recommendations with a budget.

Open the drill data and last report

Step 1 of 9

  • 0.5 g/t intercept cut-off(not yet applied)
  • Standards within limits(not yet applied)
  • Inferred kept separate(not yet applied)
  • Matches the news release(not yet applied)

4 Geologists Per Month

Current5.6reports
Future17reports
Hours automated
448
per month
Extra reports
+11
per month
Capacity
3x
vs today
Extra fees
$269K
per month